1998 | MOL Rt. Algyő EED Peak plant control technology system design |
2000 | MOL Rt. Algyő Complete control technology system design of E10 tank farm |
2000 | MOL Rt. Main collector base upgrading system design |
2000 | MOL Rt. Algyő Control technology design of process chromatograph at railway loader |
2000 | Prímagáz Rt. Algyő E2 Computer monitoring system design |
2001 | MOL Rt. Algyő Control technology design of railway loader, gas product cleaner, public loader and storage tanks |
2002 | MOL Rt. Algyő Control technology reconstruction system design of railway loader gasoline loader stations |
2002 | MOL Rt. Ortaháza (Bajánysenye-Őriszentpéter) Control system design of PB system |
2003 | MOL Rt. Tuzsér Design of system upgrading in control system of railway loader |
2003 | MOL Rt. Algyő Desgin of safety system at railway loader |
2003 | MOL Rt. Algyő Upgrading system design of one station loader at railway loader |
2003 | MOL Rt. Algyő Upgrading system design of four station loaders at railway loader |
2003 | MOL Rt. Algyő Upgrading system design of gasolin loader at railway loader |
2003 | MOL Rt. Algyő Pentane loading system design of gasolin loader at railway loader |
2003 | MOL Rt. Algyő System design of transportation of import product between railway loader and E10 tank farm |
2004 | MOL Rt. Hajdúszoboszló System design of works that subject to authorization of railway loading system usage |
2005 | MOL Rt. Algyő Complete control technology and communication system design of ATM store, E10 tank farm and railway loader |
2005 | MOL Rt. Szank gas plant Reconstruction of control technology: process controll system design |
2005 | MOL Rt. Szank gas plant Reconstruction of control technology: Work stations and communication system design in the central contol room |
2005 | MOL Rt. TKD Logistics Százhalombatta, P5031, 212J pump room, design of installation of three pieces of pump |
2005 | MOL Rt. Atmosheric PB tank System design of replacing the air compressor |
2005 | MOL Rt. Atmosheric PB tank System design of water supply for cooling circuit and boiler |
2005 | MOL Rt. Algyő Railway loader: system design to control and measure the waste gas blast |
2005 | MOL Rt. Algyő Railway loader: system design of expansion of the clean product dealer system |
2006 | MOL Rt. Algyő Atmospheric 30 m3 PB tank: study plan for control technology |
2006 | Déva (Romania) Spa: Design of electrical building monitoring and automating |
2006 | MOL Nyrt. Romania Telegd Control system design for upgrading gas product load monitoring system |
2006 | MOL Nyrt. Zala Refinery Control system design for upgrading gas product load monitoring system |
2006 | MOL Nyrt. Algyő Railway loader: System design for modification gasolin loaders into gas product loaders |
2006 | MOL Nyrt. Ortaháza System design for level measurement at tank farm |
2006 | MOL Nyrt. Algyő Railway loader: Control of heating gas pressure for bolier |
2006 | MOL Nyrt. Algyő Railway loader: System design for N2 line modification into propane transportation |
2007 | Rotary Drilling Zrt. Algyő: System design for handling the 2000 m3 capacity technological fluid plant |
2007 | SPP (Slovakia) Control technology design for portable compressor unit |
2007 | Henkel Hungary Kft. Study plan for a complete electrical production control technology |
2007 | Közép-Európai-Gázterminál Zrt. System design for install a process montoring and controlling system for LPG tanks |
2007 | MOL Nyrt. Szank Gas plant: System design for engine installation in the lines of Tázlár |
2007 | MOL Nyrt. Romania Telegd Fule loader: System design for upgrading measurements and control technology |
2007 | Karcag lido, System design for separating and utilizing the gas of thermal well |
2007 | Tiszaföldvár, System design for separating and utilizing the gas of thermal well |
2007 | MOL Nyrt. Algyő Railway loader: System design for measuring gas torches |
2007 | MOL Nyrt. Algyő Railway loader: System design for regulated supplying the GTT towers |
2008 | MOL Nyrt. Algyő, Study plan for expansion the capacity of PB tank |
2008 | MOL Nyrt. Százhalombatta Tank car loader: Design for modification the top loading into bottom loading |
2008 | SHUAIBA (KUWAIT) Gas plant: Design for instruments of heating gas compressor units |
2008 | Sole-Mizo Zrt. Csorna, Design the PLC control for ultrafilter equipment |
2008 | MOL Nyrt. Logistics PBTT Algyő Ralway loader: Control technology design for measuring the gas for torch |
2008 | MOL NYRT. Logistics PBTT Algyő Railway loader: Control technology design for regulated supplying the GTT towers |
2008 | MOL Nyrt. Logistics LPG facilities Algyő, Project Algyő, Control technology and instrument and electrical modification and design for loader-separator |
2008 | RWE: Electrical system and control technology design for portable compressor unit, inculding ATEX licensing preparation and explosion protection ducumentation |
2009 | MOL Nyrt. Hosszúpályi: Electrical, primer instrument and control technology design for 500 kW compressor unit |
2009 | UNILEVER Cubitos Plant: Control design for GEA air technology |
2009 | Sole Mizo Zrt. Design for upgrading the complete control technology system |
2009 | EON Gas Storage Zrt. Szank: Hardware and software DCS control design for K-41, K-42, K-43 compressors |
2009 | North Budapest Sewage cleaner plant: Control technology design, upgrading, capacity expanding |
2010 | Szeged Region Sewerage system: control technology and instrument design |
2010 | MOL Nyrt. KTD NF: Control technology design for upgrading compressor farm |
2010 | MOL Nyrt. Szank, Control tecgnology design for efficiency increasing project |
2011 | MOL Romania Telegd Base site: Design works for capacity expanding |
2011 | MOL Nyrt. Logistics, SEVESO-II Project, Design works for construction |
2011 | MOL Nyrt. Algyő Tank car loader No. 2, Modification documentation |
2011 | MOL Romania Telegd, Modernization design |
2011 | MOL Nyrt. TIFO-TVK, Design for separating and storing PB gas |
2012 | Sole Leskovac: Control design for Stork |
2012 | Sole Leskovac, Control designing |
2012 | MOL Nyrt. Algyő Railway loader: Design for gas product cleaning and capacity expanding |
2012 | MOL Nyrt. PBTT Design for reconstruction of fire water |
2013 | Halaspack, Design for measuring coil accuracy straightness |
2013 | Halaspack, Design for integrating measuring equipment in the registrating system |
2013 | MOL Nyrt. System design for fire water reconstruction |
2013 | MOL Nyrt. KTD Endrőd, Design for compressor displacement |
2014 | MOL Nyrt. Algyő PBTT Reconstruction of fire water |
2014 | MOL Nyrt. Algyő PBTT, Capacity expanding of gas cleaner |
2014 | Auchan, Szeged, Building monitoring system installation |
2014 | SOLE PET machine integration in the GEA path monitoring system |
2014 | SOLE SattGraph and PLC, Complete reconstruction of control technology |
2014 | MOL Nyrt. PBTT Algyő E10 tank farm, Supercharge protection |
2014 | MOL Nyrt. PBTT Algyő, Reactivation of gasolin line |
1998 | MOL Rt. Burst proof control technology system for Móraváros |
1999 | MOL Rt. HTTÜ SzBü, Ferencszállás Gas plant, Control technology for gas collector stations |
2000 | MOL Rt. Main collector base system upgrading |
2000 | MOL Rt. Algyő Complete control technology system for E10 tank farm |
2000 | MOL Rt. Algyő Control technology system for process chromatograph at railway loader |
2000 | Vértesi Erőmű Rt. Oroszlány thermal power station, Control technology system for water softener plant |
2000 | Prímagáz Rt. Algyő E2 Computer monitoring system |
2000 | Vértesi Erőmű Rt. Tatabány thermal power station, Monitoring system for boilers |
2001 | Renner Bt. Jánoshalma, Automation and production control system for 12 compactor |
2001 | MOL Rt. Algyő Control technology for railway loader, gas product cleaner, public loader and storage tanks |
2002 | MOL Rt. Algyő Control technology reconstruction system for railway loader gasoline loader stations |
2002 | MOL Rt. Ortaháza (Bajánysenye-Őriszentpéter) Control technology system for PB separating |
2003 | DÉGÁZ Rt. Szeged, Replacing the control technology of the compressor of car loader station |
2003 | PICK Szeged Rt. Maros street plant, Temperature registration of frozen products |
2003 | PICK Szeged Rt. Maros street plant, Control technology for cold store with persistent monitoring |
2003 | MOL Rt. Tuzsér, System upgrading in control system of railway loader |
2003 | MOL Rt. Algyő, Safety system at railway loader |
2003 | MOL Rt. Algyő Upgrading system for one station loader at railway loader |
2003 | MOL Rt. Algyő Upgrading system for four station loaders at railway loader |
2003 | MOL Rt. Algyő Upgrading system for gasolin loader at railway loader |
2004 | MOL Rt. Algyő E10 tank farm, Software works for electrical actuation kit installation |
2004 | Eufóka Kft. Cold store data registration, Registrating system installation |
2004 | MOL Rt. Hajdúszoboszló System design of works that subject to authorization of railway loading system usage |
2004 | MOL Rt. Algyő System design of transportation of import product between railway loader and E10 tank farm |
2004 | Kistelek Szalámi plant, Construction for registrating humidity and temperature of frozen product |
2004 | Pick Szeged Rt. Slaughterhouse, CO2 measuring and signing system installation |
2004 | Pick Szeged Rt., Infrasensor system installation for hygiene handwashers |
2004 | Pick Szeged Rt., SCADA system installation for temperature data registrating |
2004 | Pick Szeged Rt. Maros street plant, Control technology for compressors and tanks |
2004 | Renned Bt. Jánoshalma, Control technology for painting automatic machine |
2005 | MOL Rt. Algyő Complete control technology and communication system for ATM store, E10 tank farm and railway loader |
2005 | HENKEL Hungary Kft. Körösladány plant, Monitorint system installation |
2005 | Pick Szeged Rt. Central plant, Modernization of data registration system at climatic tower |
2005 | Pick Szeged Rt. Central plant, Temperature measuring and registrating system at smoking rooms |
2005 | Pick Szeged Rt. Central plant, Modernization of flaming automation system |
2006 | MOL Nyrt. Zala Refinery Control system for upgrading gas product load monitoring system |
2006 | MOL Rt. Atmosheric PB tank, Replacing the air compressor |
2006 | Orosháza spa, Building monitoring system installation |
2006 | Pick Szeged Zrt. Central plant, Upgrading the automation system of boiling smoking appliances |
2006 | Pick Szeged Zrt. Maros street plant, Temperature and humidity control in 28 rooms |
2006 | Richter Gedeon Nyrt., Distillation tower automation |
2006 | Sole-Mizo Zrt., Replacing of automation system of E-D CIP appliance |
2006 | Sole-Mizo Zrt., Frozen product temperature registrating system installation |
2006 | Borsodchem Rt. - NaOH analyst equipment automation |
2006 | Zenon Rt. Membrane factory expansion: 0,4 kV control panel, PLC panel, field control panel production |
2006 | Richer Gedeon Rt., Automation and temperature measuring system installation for air pipes |
2006 | Reanalz Rt. III. Plant, Cooler and boiler system high pressure protection installation |
2006 | MOL Nyrt. Székesfehérvár plant, Tank farm monitoring system installation |
2006 | Halaspack Bt., Automation system for drying room recipes |
2007 | Cserepovec steelworks (Russia), Data registering and commnication system for crane stations |
2007 | Reanal Zrt. Hemo plant, Storage vacuum system automation |
2007 | Reanal Zrt., Chemistry plant, Air technology system automation |
2007 | Reanal Zrt. Hemo plant, Vacuum pump system automation |
2007 | MOL Nyrt. Algyő Railway loader: Modification: gasolin loaders into gas product loaders |
2007 | Continental-Contitech Szeged, Monitoring and construction handling system installation |
2007 | Közép-Európai-Gázterminál Zrt., Process monitoring and controlling system for LPG tanks |
2007 | MOL Nyrt. Ortaháza System for level measurement at tank farm |
2007 | Reanal Zrt. Chemistry plant: Safety system for drying panels |
2007 | Richter Gedeon Rt. Temperature registration system installation |
2007 | Richter Gedeon Rt.: Automation for fermenter |
2007 | Richter Gedeon Rt.: Automation for sewage stripping column system |
2007 | Pick Szeged Zrt. Central plant: Control technology reconstruction for sausage filling preparation |
2007 | Pick Szeged Zrt. Baja: Air and control technology upgrading for ripening rooms |
2007 | Sole-Mizo Zrt.: Control technology and mechanical reconstruction for tray maker |
2007 | Richter Gedeon Nyrt.: Monitoring system for safety technology laboratory |
2007 | MOL Nyrt. Romania Telegd Control technology system for upgrading gas product load monitoring system |
2007 | Dunafer smoke equipment, Installation of gas analyzing system |
2007 | Richter I6 fermenter, Intsallation of control technology system |
2007 | Karcag lido, Control technology system for separating and utilizing the gas of thermal well |
2007 | KWS Hungary Kft., Temperature and humidity control for seed store |
2007 | Tiszaföldvár, Control system for separating and utilizing the gas of thermal well |
2007 | MOL Nyrt. Tiszaújváros, Csepel, Székesfehérvár base, VRU steam recovery system installation |
2007 | Mangary Kft. Tompa meat-packing, Air-conditioning and control technology installation |
2007 | Bácsvíz Zrt., Automating and upgrading measuring system for bio gas system |
2007 | MOL Gas transportation Miskolc, Vecsés station, Control technology reconstruction |
2008 | Rotary Zrt. Algyő, Control technology installation for 2000 m3 liquid manipulator base |
2008 | Richter Nyrt. Control technology works for safety technology laboratory |
2008 | GEA Air technology control installation for SZTE Hematology |
2008 | University of Szent István Gödöllő, Control technology works for Moniac model |
2008 | Pick Szeged Zrt. Baja, Control technology upgrading for temperature registration system |
2008 | Sole-Mizo Zrt. Szeged, Automation for tray forwarder |
2008 | MOL Nyrt. Székesfehérvár plant, Programing for pump control |
2008 | MOL Nyrt. Atmospheric PB tank, Compulsory quarter revision of gas density in cooling circuit |
2008 | Kiskunmajsa poultry plant, Caloric cooling system installation |
2008 | Sarsan Kft., Complete control panel and PLC programming of sorter machine |
2008 | Proktel & Gambeltampon, Automation of packing line |
2008 | Jekatyerinburg, Automation of water works |
2008 | Reanal Zrt., Air conditioner and boiling system automation for drying room |
2008 | Metalfloor Kft., Air technology construction |
2008 | Reanal Zrt., Replacing of distribution boxes |
2008 | Halaspack Kiskunhalas (Slovakia plant), Complete control panel construction and PLC programming of paperdryer machine |
2008 | Sarsan Kft., Complete control panel construction and PLC programming for foil packing machine |
2008 | Elcoteq Pécs, PLC programming for consumption measuring |
2008 | Richter F26 Fermentor, Control technology system construction |
2008 | Polygon Kft., Persistent air technology monitoring and air conditioning of server rooms |
2008 | Richter I8 Fermentor, Control technology system construction |
2008 | Halaspack Kiskunhalas, Upgrading control technology of INDOSA MST131 machine |
2008 | Halaspack Kiskunhalas, Upgrading control technology of INDOSA TWIN machine |
2008 | KWS Hungary Kft., Air conditioning of server room |
2008 | Sole-Mizo Zrt. Csorna, PLC control technology and programming for ultrafilter appliance |
2008 | Hungrana, Control technology system construction for CGF dryer technology |
2008 | SANYO Solar panel factory, Automation of production line |
2008 | SHUAIBA (KUWAIT) Gas plant: Construction works for instruments of heating gas compressor units |
2008 | MOL Nyrt. Logistics PBTT Algyő Ralway loader: Control technology for measuring the gas for torch |
2008 | Moltech AH Kft., Air technology contruction works |
2008 | MOL NYRT. Logistics PBTT Algyő Railway loader: Control technology design for regulated supplying the GTT towers |
2008 | Richter Cemistry plant, Measuring system automation (DCS system construction) |
2008 | Sarsan Kft., Complete control panel construction and PLC programming for pipe-fitter |
2008 | RENNER Bt. Complete control panel construction and PLC programming for screw-tap machine |
2008 | MOL Nyrt. Romania Telegd fuel loader, Instrumental construction works |
2008 | Elekroprompt Kft., Communication settings for Prolan Modbus |
2008 | Sole-Mizo Zrt. Szeged GEA ESL Technologies, Construction works for UHT and aseptic tank settings |
2009 | RWE Electrical system and control technology for portable compressor unit |
2009 | MOL Nyrt. Hosszúpályi: Electrical, primer instrument construction works and control technology for 500 kW compressor unit |
2009 | Richter Dorog, PLC programming for chrome regenerating |
2009 | UNILEVER Cubitos Plant: Control panel construction work and programming for GEA air technology |
2009 | Közép-Európai Gázterminál Zrt., Construction works for process monitoring and control for 63 m3 tank |
2009 | Sole-Mizo Zrt. Szeged, Control panel construction works and PLC programming for GEA-CIP cleaning |
2009 | Halaspack Kiskunhalas, Control panel construction works for dryer |
2009 | Szögedi Brewery recipe maintenance |
2009 | MOL Nyrt. Algyő E10 tank farm, System maintetnance at Enraf level measuring |
2009 | Renner Bt., PLC programming for rubber oven |
2009 | Halaspack Kiskunhalas, Refurbish of control technology for old dryer |
2009 | Szögedi Brewery, Cooking registration |
2009 | MOL Nyrt. Logistics Algyő E-10 tank farm, Complex refurbishing of control and instrument and electrical technology for loader-separator |
2010 | Szeged Region Sewerage system: control technology and instrument construction works |
2010 | Richter Dorog PLC programming for autoclave |
2010 | Déva (Romania) spa, Building montirong and automation |
2010 | Sarsan Kft, Control technology and instrument contruction works for pipe-fitter |
2010 | MOL Nyrt. Algyő ATM PB tank, Control technology and instrument construction works for decontaminate CH |
2010 | Halaspack Bt., Construction works and programming SCADA system |
2010 | TMV Szeged, Installation of wastewater quality meter |
2010 | MOL Nyrt. Logistics Algyő E-10 tank farm, Complex refurbishing of control, instrument and electrical technology for loader-separator |
2010 | Sole-Mizo Zrt., Upgrading SCADA system |
2010 | MOL Nyrt. Algyő, ATM PB tank, Decontaminate CH |
2010 | Halaspack Bt., SMS sender server |
2010 | MOL Nyrt. Logistics storing, Algyő railway loader, PB load-store loader-separater, Complex reconstruction of control technologies |
2010 | MOL Algyő SEVESO-II system, Construction works |
2011 | SOLE SattGraph SCADA replacing |
2011 | Halaspack Bt., Control technology construction works for paper dryer |
2011 | MOL Nyrt. Logistics Algyő, Ortaháza, Hajdúszoboszló, Product scale production providing |
2011 | Halaspack Bt., Control technology construction works for paper dryer in Lipcse |
2011 | HIDROKOM, Cable laying |
2011 | SARSAN Kft., Bin washer |
2011 | KEG, Field works and control technology expanding for T251-252 tanks |
2011 | MOL Nyrt. Kecskemét plant, Maintaining control technology and elecrical system |
2011 | Szegedi Waterworks, Gas sensor |
2011 | MOL Nyrt., Modernization of NF drives |
2011 | SOLE Leskovac, Line supervision |
2011 | SOLE GEA TT3, Line supervision |
2011 | MOL Nyrt. Logistics Algyő E10 tank farm, Periodic examination of spherical tanks |
2011 | Szeged Waterworks, Reconstruction of Rockwell process control |
2011 | SARSAN Kft., Legrand power outlet examiner |
2011 | MOL Nyrt. Logistics TKD Algyő, PB load-store, Normalizing gas-cleaning process |
2011 | SOLE SQL registration |
2011 | SOLE BOSCH coffee-cream machine, Line supervision insertion |
2011 | MOL Romania Telegd plant, Capacity expanding construction works |
2011 | MOL Nyrt. Algyő Tank car loader No. 2, Modification construction works |
2011 | CASON Székesfehérvár, Modification of AB PLC |
2011 | MOL Nyrt. TIFO-TVK, Construction works for separating and storing PB gas |
2012 | MOL Nyrt. Logistics, SEVESO-II, Railway site construction |
2012 | Ganzair SEVEGA Russia, PLC programming for portable compressor |
2012 | Givaudan Makó, Programming Siemens building monitoring |
2012 | SOLE Leskovac, Control technology for Stork |
2012 | Sole Leskovac, Control technology construction works |
2012 | Continental Romania, SARSAN Kft, Construction works for bin washer |
2012 | MOL Nyrt. Logistics, Algyő SEVESO-II E10 tank farm, Railway loader construction work |
2012 | MOL Nyrt. Szajol railway loader, Density measuring installation |
2012 | MOL Nyrt. Algyő E10 tank farm, Installation of 6 motoric drives |
2012 | Richter-Gedeon Zrt. Dorog, Modification of chrome regenerating |
2012 | MOL FGSZ Zrt., Intallation of Auma power unit |
2012 | Sole-Mizo Zrt., Expanding of product line supervision |
2012 | MOL Romania Telegd, PB Modernization construction work |
2012 | MOL Nyrt., Desgin of safety system at railway loader |
2012 | Richter-Gedeon Zrt., ABB validating documentation |
2012 | PICK Szeged Zrt., Tower communication |
2012 | Lombard house, PLC replacing |
2012 | MOL Nyrt. E10 tank farm, Train displacement |
2012 | MOL Nyrt. Algyő, Secondary lightning protection |
2012 | Szegedi Paprika Zrt., Replacing drive control of cutter |
2013 | Makó, Siemens building monitoring |
2013 | Halaspack, Complete electrical works and commissioning of 7 pieces of small and fast winding machine |
2013 | MOL Nyrt. SEVESO-II project, 2013, Pécs base site general construction |
2013 | SARSAN Kft., Control cabinet construction and PLC programming of motor tester |
2013 | Halaspack,Construction and commissioning measuring device for measure coil accuracy straightness |
2013 | MOL Nyrt. Csepel, Replacing VRU PLC |
2013 | MOL Nyrt. Tiszaújváros, Replacing of density meter |
2013 | Halaspack, Integrating and commissioning measuring equipment in the registrating system |
2013 | MOL Nyrt., Programming of CC2 compressor |
2013 | Fire sign system construction at Seszták Imre Compressor base |
2013 | Flowell Richter-Gedeon, Modification of data registering of safety tecnology laboratory |
2013 | SOLE, PLC replacing of separator |
2013 | Halaspack, German paper dryer construction work |
2013 | SARSA Kft. - Continental, Framed mounting machine construction work |
2013 | SOLE, Modernization of Slovak and Central CIP |
2013 | MOL Nyrt. PB loader and storage, Insufficiency exploration of explosion protection |
2013 | Barabás Mérnökiroda, Control technology construction od cutting machine |
2013 | Szeged Waterwork, Construction of sewage gas measuring |
2014 | SOLE, Optical network expanding |
2014 | Pick Szeged Zrt., iFix client for boiler-smoker |
2014 | SOLE, Cable replacement of Brick robot |
2014 | MOL Nyrt. Algyő PBTT Reconstruction of fire water |
2014 | MOL Nyrt. Algyő PBTT, Capacity expanding of gas cleaner |
2014 | Auchan, Szeged, Building monitoring system installation |
2014 | SOLE PET machine integration in the GEA path monitoring system |
2014 | SOLE SattGraph and PLC, Complete reconstruction of control technology |
2014 | MOL Nyrt. PBTT Algyő E10 tank farm, Supercharge protection |
2014 | SOLE, Kefir line supervision |
2014 | MOL Nyrt. PBTT Algyő, Reactivation of gasolin line |
2014 | SOLE, Common line supervision for Trepko-Pet-Asepto system |